MCQ Single Best Answer Difficult

QLoad and Longevity test can be triggered parallelly.

ID: #24008 Component and Integration Pipelines 129 views
Question Info
#24008Q ID
DifficultDifficulty
Component and Integration PipelinesTopic

Choose the Best Option

Click any option to instantly check if you're correct.

  • A False
  • B True
Correct Answer: Option B

Explanation

True

Load testing and Longevity testing can be triggered in parallel since they serve different purposes:

  • Load testing evaluates system performance under expected or peak load conditions.
  • Longevity testing (also called endurance testing) checks system stability over an extended period.

Running them in parallel can help save time and identify performance bottlenecks efficiently.